Commit Graph
4 Commits
Author SHA1 Message Date
alexm 941af6bc78 Inputs cut short by the clock count only where a claim is open
Test / gate (push) Canceled after 0s
A proof report named a routine as stopped by the clock whenever the
generated inputs that cross-check it were cut short, even when every
claim of it was proved and nothing was left undecided. On a loaded
machine that is the common case: a container running the site's tests
on two processors reported it for the simplest proved example. The
prover running out of time still counts always; the inputs' clock
counts when a claim of the routine is still open.
2026-11-13 07:32:45 -05:00
alexm 38e6e2cdd2 A proof report says when the clock stopped it
Test / gate (push) Canceled after 0s
The Prove tab gives each routine 3 seconds on the clock, and on a slow
or busy machine that runs out before the proof does: claims stay open
with nothing to say why. Now the prover marks a unit it ran out of time
on (timedOut, and an out-of-time note), checkProperties says when the
clock cut its inputs short, and ProofReport.clock carries the budget and
the routines it stopped, so a caller can offer more time.
2026-11-13 06:55:11 -05:00
alexm b10a5c87a3 A gate that does not depend on its machine, on a runner of its own
Test / gate (push) Canceled after 0s
The gate first ran on the server that deploys the site: a slow container
with no C compiler and no ICU. Ten tests failed there on correct code,
and no Mojo program could be built at all.

- The workflows ask for a runner labeled heavy, not the deploy server:
  the gate builds and runs some 300 Mojo programs and fuzzes. docs/ci.md
  says how to register one. With none registered a run waits.
- The pinned environment has a C compiler on Linux (gcc, with its C
  library pinned to glibc 2.34): mojo build links with the C compiler it
  finds, and conda-forge's default links against a C library too old
  for Mojo's runtime. mojo-local reports a program that could not be
  linked as that, and does not keep the answer.
- The pinned Dafny runs without ICU, and dafny-fetch fails when the
  Dafny it fetched does not start.
- A test's time limit is processor time at the machine's pace
  (tests/helpers/pace.mjs).
- The prover's time on the clock is the caller's: provePseudo and
  Workspace.proofBudgetMs take it, the Prove tab's 3 seconds stay the
  default, and the command line, library-check and the tests use none,
  so their answers are the counted budgets' alone.
- The library pointer moves to its workflow change (e5ae090).
2026-11-13 06:13:28 -05:00
alexm 401084bab3 Initial commit
Test / gate (push) Failing after 19m0s
2026-11-12 22:23:54 -05:00