Test / gate (push) Canceled after 0s
A proof report named a routine as stopped by the clock whenever the generated inputs that cross-check it were cut short, even when every claim of it was proved and nothing was left undecided. On a loaded machine that is the common case: a container running the site's tests on two processors reported it for the simplest proved example. The prover running out of time still counts always; the inputs' clock counts when a claim of the routine is still open.