A gate that does not depend on its machine, on a runner of its own
The gate first ran on the server that deploys the site: a slow container
with no C compiler and no ICU. Ten tests failed there on correct code,
and no Mojo program could be built at all.

- The workflows ask for a runner labeled heavy, not the deploy server:
  the gate builds and runs some 300 Mojo programs and fuzzes. docs/ci.md
  says how to register one. With none registered a run waits.
- The pinned environment has a C compiler on Linux (gcc, with its C
  library pinned to glibc 2.34): mojo build links with the C compiler it
  finds, and conda-forge's default links against a C library too old
  for Mojo's runtime. mojo-local reports a program that could not be
  linked as that, and does not keep the answer.
- The pinned Dafny runs without ICU, and dafny-fetch fails when the
  Dafny it fetched does not start.
- A test's time limit is processor time at the machine's pace
  (tests/helpers/pace.mjs).
- The prover's time on the clock is the caller's: provePseudo and
  Workspace.proofBudgetMs take it, the Prove tab's 3 seconds stay the
  default, and the command line, library-check and the tests use none,
  so their answers are the counted budgets' alone.
- The library pointer moves to its workflow change (e5ae090).
2026-11-13 06:13:28 -05:00

15 KiB

Limits

A program can arrive in a share link, so every reader and every run in core has to answer any text with diagnostics, an output, a stop or a refusal: never with an exception from the JavaScript engine underneath, a run without end, or an allocation the size of the text's mistake. This page lists each limit that makes that so: where it is, its value, and what the student sees past it. Each is far beyond what a program written to be read or stepped through needs, and each is proven just past its value by a test.

Reading

What Where Value Past it
Mojo nesting: brackets, call and index arguments, blocks, prefix operators, **, if/else, :=, lambdas MAX_NESTING, src/mojo/parse.ts 200 levels The statement is not read: one note, "nested more than 200 levels deep; Programming+ cannot read this yet, and Compile & run asks the real compiler", where the limit is passed. The checks stay quiet and a run is declined, as for any code the parser cannot read
Mojo tree height: each operand of a chain such as a + b + c, each elif arm, each level above MAX_TREE, src/mojo/parse.ts 1,000 levels The statement (the innermost one that is too tall) is not read: one note, "more than 1000 levels deep once read"
Mojo liveness and moved-value analyses (a loop's body is walked twice or more per enclosing loop) MAX_VISITS, src/mojo/lifetimes.ts, src/mojo/flow.ts 200,000 statements per function The function is not analyzed: the interpreter declines to say when a value with a visible lifecycle dies, and the moved-value check says nothing more about it
Generated inputs for Mojo functions (mojoProperties) MAX_PARAMS, MAX_FUNCTIONS, src/mojo/properties.ts 64 parameters, the first 100 functions The report says the function has too many parameters, or is past the first 100
Pseudo nesting, one chain of an operator, and the tree both make together MAX_NESTING, MAX_CHAIN, MAX_TREE, src/engines/pseudo/parse.ts 200 levels, 400 operands, and an expression's tree 400 levels tall (brackets that each hold a long chain) One too-deep error
One pseudocode program (the pseudo pane, and the pseudocode any other pane becomes) MAX_PSEUDO_LINES, MAX_PSEUDO_CHARS, src/services/pseudo-study.ts 2,000 lines, 100,000 characters One too-long error on the line that passes it: "This program is more than 2,000 lines long" (or "longer than 100,000 characters"), "which is more than this tool reads: the lines from here on are not read, and the program is not run or proved." Blank lines past it do not count
lingo nesting: brackets, "not", "minus", quantifiers, steps inside steps MAX_NESTING, src/engines/pseudo/english.js 200 levels One too-deep error: "This is nested more than 200 levels deep, which is more than this tool reads"
One lingo sentence MAX_SENTENCE, src/engines/pseudo/english.js 1,000 words and symbols One too-long error; the rest of the sentence is not read
lingo routines and defined phrases (every value is tried against each one's first line) MAX_HEADS, src/engines/pseudo/english.js 200 One too-long error; the ones past it are not read
One lingo program MAX_PSEUDO_LINES, src/engines/pseudo/english.js 2,000 lines One too-long error; the lines past it are not read
The pseudocode lingo steps become MAX_PSEUDO_LINES, src/engines/pseudo/english.js 2,000 lines One too-long error; it is not checked or run
matho nesting: brackets, groups, \frac, \sqrt, powers and subscripts in braces, functions of functions, signs MAX_NESTING, src/services/matho.ts 200 levels matho-too-deep on that equation
One matho equation MAX_TOKENS, src/services/matho.ts 2,000 symbols matho-too-long on that equation; it is not read
Equations in one matho pane MAX_EQUATIONS, src/services/matho.ts 500 matho-too-long; none is read
The pseudocode matho equations become MAX_PSEUDO_LINES, src/services/matho.ts 2,000 lines matho-too-long; it is not checked or run
LENGTH(X) written back as |X| when the speco is made from the pseudocode MAX_BARS, src/services/speco.ts 200 per claim The rest stay LENGTH(X)
A reader, translator or the prover that throws anyway src/common/workspace.ts, src/sync/hub.ts One engine-stop error on the pane ("Programming+ could not read this pane (...)"); in the hub, every other pane keeps its text, marked stale with the reason

Running Mojo

Past any of these the run stops as it does at its step limit: the trace ends with a stop at the line, and the result is limited (exit code -1), because how the compiled program would have ended is not known (RUN_LIMITS, src/mojo/interp.ts; a run may ask for lower limits, never higher).

What Value The stop says
Steps 20,000 (the caller's maxSteps) "Stopped after 20,000 steps."
Calls inside calls 200 "Stopped at 200 calls deep"
Characters in one String 10,000,000 "Stopped: this makes a String of N characters, more than Programming+ holds (10,000,000)."
Values in one List, Dict or Set 2,000,000 "Stopped: this makes a List of N values, more than Programming+ holds (2,000,000)."
Characters printed 10,000,000 "Stopped after printing 10,000,000 characters."
Values made or copied into collections, over the run (what it can come to hold) 5,000,000 "Stopped after making or copying 5,000,000 values in Lists, Dicts and Sets"
Characters and values built, copied or searched through, over the run (how long it can take; the whole length of a concatenation counts, because the trace keeps every step's String) 100,000,000 "Stopped after building, copying and searching through 100,000,000 characters and values"
Variables' values the trace records, one per variable per step 1,000,000 "Stopped after recording 1,000,000 values of variables"
Passes of one call of std.math's gcd or comb (MATH_STEPS), which the interpreter runs as Mojo 1.2.0's own loops: its gcd of an even number and a much larger odd one subtracts about 10^15 times, and the built program does not come back 1,000,000 "Stopped: gcd(6, 4503599627370597) takes more than 1,000,000 steps in Mojo's std.math ..., more than Programming+ follows in one call."
The engine's own stack or size limit, past all of the above "Stopped: the run went deeper ... than Programming+ can follow." or "Stopped: a value grew larger than Programming+ can hold."

A for loop lists only the items it can reach before the step limit. The trace shows a String past 1,000 characters and a collection past 20 items cut short; print writes them whole. What the engine underneath cannot compute is declined, as anything the interpreter does not model is ("Programming+ cannot run this yet: ..."): a shift by more than 64 bits, converting inf or nan to an integer, a float literal with more than 10,000 digits or an exponent past 10,000, and any other exception, which is a fault in Programming+ rather than an answer.

The model machine

What Where Value Past it
Steps maxSteps, src/engines/asm86/interp.js 20,000 The run is truncated
One memory region a setup maps MAX_REGION 1 MiB The run does not start: "this machine maps regions of 0 to 1,048,576 bytes (1 MiB)"
Memory copied while writing (each step that writes a region keeps a copy for stepping back) MAX_COPIED 128 MiB The run stops: "the steps so far wrote to memory regions totaling 128 MiB"
The stack stackSize 512 bytes A page fault, explained as a stack overflow

Proving and testing

The prover's work is counted, not timed: each term it builds or visits, each case of a case split, each pair of constraints it combines, each fact it copies is a unit (work in src/engines/pseudo/logic.ts). A budget therefore runs out at the same point on every machine and in every test, and because the units are counted where memory is allocated, memory stays in proportion. Past a budget the answer is never "proved": an obligation is open with the reason "too large to prove here", or the subroutine is partial and says so (in the Prove tab a partial subroutine has nothing marked proved). Every program of the corpus takes far less than each budget, and proves the same as before they were added (tests/prover-limits.test.mjs proves each budget past its value).

What Where Value Past it
Proving one obligation PROVE_WORK, src/engines/pseudo/solver.ts 2,000,000 units The obligation is open: "too large to prove here"
Following one subroutine's paths and finding its loops' invariants UNIT_WORK, src/engines/pseudo/vcgen.ts 40,000,000 units The subroutine is partial, with the note "This subroutine is too large to prove here: the checker stopped before the end of it, so nothing in it is marked proved. Every run still checks it."
Proving one subroutine's obligations PROOF_WORK, src/engines/pseudo/vcgen.ts 20,000,000 units Each obligation not yet proved is open: "too large to prove here"
Everything above, for a whole program PROGRAM_WORK, src/engines/pseudo/vcgen.ts 60,000,000 units The subroutines after it are partial, with the same note
How deep a value the checker follows is (T <- T + A[T] + ... line after line builds one operation inside another) MAX_DEPTH, src/engines/pseudo/vcgen.ts 500 operations (the corpus's deepest: 18) The value becomes one the checker knows nothing about, with the note "The value on line N is built from more than 500 operations one inside another, more than the checker follows: from there on it treats such a value as one it knows nothing about, so what depends on it stays open." The engine's own stack or size limit, past everything, is the same as running out of work: the unit is partial, or the obligation open, too large to prove here
A term's key, which finds equal terms (a term that shares its parts, such as nested ABS, is far longer written out) MAX_KEY, src/engines/pseudo/logic.ts 2,000 characters The term is equal only to itself: the prover concludes less about it, never more
A fact or goal written out with an obligation SHOW_PARTS, src/engines/pseudo/logic.ts 1,000 parts The rest is written "…"
The facts and goals one subroutine's report writes out SHOWN_CHARS, src/engines/pseudo/vcgen.ts 1,000,000 characters Each further obligation shows its goal alone, cut at 400 characters
The hypotheses looked through for the facts shown with an obligation SHOWN_FROM, src/engines/pseudo/vcgen.ts the nearest 400 The facts shown come from those
The generated inputs that cross-check a proof (checkProperties), counted in steps and positions visited by FORALL, EXISTS, SUM and sets written by rule CROSS_CHECK_ROUTINE, CROSS_CHECK_PROGRAM, src/services/pseudo.ts 600,000 for one routine, 1,200,000 for a program No more inputs are tried (the routines after it, none): an obligation they would have shown broken stays open. A run cut short by the budget is not a failure
The sample runs that check the equations a matho pane is given give the pseudo's values READ_BACK_VISITS, src/sync/pseudo-to-matho.ts 100,000 quantifier positions a run The run stops there, on both sides alike, and the check compares where they stopped
The fuzzer's inputs for one routine (the Tests view, Workspace.fuzz), counted the same way WORK_PER_INPUT, src/common/fuzz.ts 3,000 for each input the budget asks for: 900,000 at the default 300 No more inputs are run, and the report's problem says "Stopped after N steps of work, all one routine's inputs may take here (M): the inputs listed were run, and no more." A failure found before is kept, shrunk as far as the work allowed
The routines of one program the fuzzer tests FUZZ_ROUTINES, src/common/workspace.ts the first 100 A report with no cases: "Not tested: generated inputs cover the first 100 routines of a program, and this is routine N."
The fuzzer's work for a whole program FUZZ_PROGRAM_INPUTS, src/common/workspace.ts 600 inputs' worth: 1,800,000 at the default budget A report with no cases: "Not tested: the routines before this one took all the work the tests of one program may take (1,800,000 steps)."

The wall-clock budget the Prove tab gives each subroutine (3 seconds, PROVE_BUDGET_MS in src/services/pseudo.ts) stays behind these as a last resort. It is the caller's: provePseudo and Workspace.proofBudgetMs take another, and what has to say the same thing on every machine takes none (pixi run cli prove unless --budget-ms gives one, library-check, the tests), so the counted budgets decide alone. The clock is the one part of a proof that depends on the machine: on CI's runner, where the README's example took more than its 3 seconds (it takes 5 milliseconds on the machine this was written on), 4 of its 6 obligations stayed open. A slow or busy device shows the same in the Prove tab: fewer obligations proved, more open, none wrongly proved. Measured on the machine this was written on: 20 nested ABS (or a matho pane f(x) = ||||...x...|||| of 20 bars) took a 1 GB heap down before, and now ends in 0.1 seconds in a 128 MB heap; a subroutine at UNIT_WORK takes 0.7 to 2 seconds, one at PROOF_WORK about 1 second, and a program at PROGRAM_WORK about 4 seconds, each in a 128 MB heap. The most any program of the corpus takes is 234,000 units for one obligation, 145,000 for one subroutine's paths, 783,000 for its proofs and 886,000 for the whole program. prove-fuzz makes larger programs than anyone writes: the most in seeds 9137 and 22051 (800 programs each) are 768,000, 35,000,000 (a subroutine its 1.5-second wall-clock budget had already cut short), 5,100,000 and 38,000,000, and the proved obligations of both seeds are the same with the budgets as without. The cross-check is counted the same way: one input of a routine whose ENSURE nests 8 quantifiers visited 5,000,000 positions (7 seconds) before, and the whole cross-check of a routine now takes at most about 2 seconds; the most any routine of the corpus takes is 347,000 (match-off-by-one). The fuzzer runs a routine's inputs within its budget in about a second, a program's in about 2 (a program of 2,000 small routines, the first 100 fuzzed: 2 seconds); the most the corpus takes is 400,000 for one routine (kmers' kmer_counts in Mojo), 1,300 for one input, and every corpus program's report is the same as before.

What the compiler does

The checker may never report an error on a program the compiler accepts, so the Mojo limits are a refusal to read, not an error. Asked through mojo build at the pin (Mojo 1.2.0), the compiler accepts 5,000 nested parentheses, 5,000 nested calls, 1,000 nested blocks, 5,000 elif arms and a 10,000-term sum, and crashes (exit 139, a stack overflow in the compiler) on 30,000 nested parentheses, a 30,000-term sum, or 30,000 minus signs. There is no depth it refuses with an error message.

The tests

tests/mojo-robustness.test.mjs proves the Mojo limits and tests/reader-limits.test.mjs the others, each just past its value with inputs small enough to keep the test quick, and each shape just under it still reading and running. tests/pseudo-robustness.test.mjs has the pseudocode's.